Basic Info.
Function
Normal Ceiling, Moisture-Proof Ceiling, Mould-Proof Ceiling
Feature
Integrated Ceilings
Surface Treatment
Spray Coating
Oxidation Resistance
Middle
Application
Office, Hotel, Household, Dust Free Room, Public
Warranty
10~15years Aluminum False Ceiling
Thickness
0.5mm~1.0mm Aluminum False Ceiling
Perforation
1.8mm,2.3mm,3.0mm
Transport Package
Packed in Standard Carton Box
Specification
300*300mm,300*600mm,300*1200mm,600*600mm,600*1200m
Product Description
Lightweight 600*600mm Powder Coating Aluminum Ceiling TileChoosing SaiyiYou will know that we are not just offer you goods price&service, but truly feel that we are sincerely solving your problem from design to construction.We are willing to be your accompany!
You will know that we are not just offer you goods price&service, but truely feel that we are sincerely solving your problem from design to construction. We are willing to be your accompany!
You will know that we are not just offer you goods price&service, but truly feel that we are sincerely solving your problem from design to construction.We are willing to be your accompany!Product Feature Suspension Ceiling:1.Design in square shape aluminum Suspension Ceiling
2.Deboss or emboss company logo is welcome
3.Surface treatment: powder coating, wooden grain, stone grain
4.Surface type: plain, perforationProduct Feature: Aluminum Ceiling TileProduct Name | Clip-in Aluminum Ceiling Tile |
Size | 300*300mm,600*600mm |
Height | 20mm |
Thickness | 0.45mm,0.5mm,0.6mm,0.7mm,0.8mm,0.9mm,1.0mm |
Powder Coating thickness | During 0.1mm to 0.15mm |
Pattern | Plain or print beautiful texture |
MOQ | 500Squaremeter Aluminum Ceiling Tile |
Color | Refer to RAL Color Chart |
Coating | Polyester Powder, PE Caoted, PVDF Powder |
Packing | 30PCS/Carton, in accordance with size |
Packing Carton | 620*330*620mm, in accordance with size |
Application: | Hotel, office, station, hospital , bathroom, kitchen, airport |
Accessories for Clip-in Ceiling | Triangle keel: 1.7m/squaremeter Hanger: 4 Pieces per squaremeter Connector: 0.4Pieces/squaremeter |
Our Services 1. We can provide you free samples within 3 days normally.
2. We provide OME and ODM services;
3. We can print customized logo and company info on carton box; Our Advantage:1. We have a complete production line to do all production processes which will reduce our cost;
2. We have big quantity of aluminum raw material in stock which will highly shorten the delivery time--Only need 5-7working days production time for 2,200sqm(One 20GP Container loading Ceiling);
3. We have strict inspection checking, those defective products will be filtered out;
4. We put our customers at the first place.Installation Way for aluminum ceiling tile
Clip-in(suspended) Ceiling Tiles Concept:
The Clip-in ceiling system(also called Dark frame or suspended aluminum ceiling) is useing the 1001/3003 grade aluminum raw material as basic material, applying our professional stretching and compression molding and other processing molding to process. It has high precision, stable shape and high surface flatness characteristics. Clip-in ceiling system is consist of decorative aluminum ceiling panels, installed keel and related accessories. The keel system is installed hiddenly in the back of the rectangular decorative ceiling and is not visible, that is why it is called the Clip-in ceiling system.
Installation for Aluminum Ceiling Suspension
***Preparation Work:
****Aluminum Ceiling Clip-in type
****Connect Triangle Carrier
****Suspension triangle carrier
****Expansion Screw M6
****Triangle carrier
****Hanger M6
****Suspension C38carrier
****C38carrier
****Connect C38 carrier
Step1: Cleaning the aluminum ceiling clip-in type and suspension C38 carrier
Step2:Measure the length of each wall in your room
***Use a tape measure to find the length of each wall in the room where you're installing your ceiling.Write the dimensions of your room either in a notebook or directly on the wall 2-3inch(5.1-7.6cm) from the top so you can easily reference them later.
***If your room is square or rectangular, you only need to measure the length and width.
Step3: Make a line between 4-6in(10-15cm) down from the tops of your walls.
**** Leave at least 4-6in(10-15cm) of space from the top of your wall to your line so you have room for fixtures and to put in your tiles. Use a 4ft(1.2m) level and draw a straight line with your pencil completely around your room.
****Snap a chalk line if you don't want to draw the lines on yourself. Hold the string of the chalk line against your wall and snap it so the line transfers onto the drywall.
****If you plan on installing a large fluorescent light panel, make your line 6in(15cm) down.
Step 4.Use a pair of tin snips to cut wall angles to the lengths of your walls.
Wall angles are long L-Shaped pieces used around the walls of your room to support the tiles and runners. Since wall angles are usually sold in 8-12ft(2.4-3.7m) lengths, trim them down with your tin snips to match the lengths of your walls.
****If you have a corner that just out from your wall, cut the wall angles going on those walls 1/2in(1.3cm) longer than your measurements
****If you want a mitered finish in the corners, cut the wall runner bottom-most wall angle at a 45-degree angle
****If your walls are longer than the wall angles, but 2 of them together by lining up the ends
Step5.Screw the wall angles into the studs along the line you drew.
****Use a stud finer to locate the studs in your walls and mark their locations with a pencil.Line up the top of the wall angle with the line you've drawn on the wall. Use 1 1/4in(3.2cm) screws and electric screwdriver where you marked the studs to secure your wall angles in place
****Double check that your wall angles are level as you install them
Tip:If a wall angle bows out, don't try to tighten it flat against the wall since it may warp the metal. Instead, keep the wall angle straight by placing a wooden shim between it and the wall. When your ceiling is completely finished, fill the gap in with caulk.
Part 2 Putting in the Conceal System
***Cut the main runners to fit the length of your room perpendicular to the joists
****The main runners will support the bulk of the weight of your ceiling.Measure the length of your room that runs perpendicular to the wooden joists of your ceiling.Cut the runners with a pair of tin snips to the correct length.
****If your room is longer than the length of a main runner, use the clips on the ends of the piece to attach them together
***Use a chalk line or tie strings across your room every 4ft(1.2m). Secure the end of a chalk line on one end of your room and pull it tight to the other side.Snap the chalk line to leave a line on the joists. Move over 4ft(1.2m) and make another line on your ceiling.
Keep moving across your room until you reach the other edge.
****You may also tie strings tight across your ceiling if you don't have a chalk line.
***Screw an eyelet into every third joist along your line.Eyelet screws have holes on the end so you can run wires through them to hang your main runner.Attach a lag bit onto your electric screwdriver, and set an eyelet inside the bit.Start placing your eyelets 3 joists away from the wall along each of your chark or string lines. Keep adding an eyelet at every third joist.
****Eye lit screws can be purchased from your local hardware store.
***Feed a length of wire through each of the eyelets
Cut a 8-10in(20-25cm) piece of 16 gauge wire for each of your eyelets.Feed about 2in(5.1cm) of the wire through the eyelet, and bend it with a pair of piliers until it points down.
***Hang up the main runners by the wires. Hold one of your main runners up so the ends rest on your wall angles and so it's perpendicular to your joists. Feed the other end of the wire through one of the circular slots on the runner, and bend it up with your pliers. Twist the wires around themselves at least 3 times to keep them secure.
****Make sure your joists are level as you keep adding wires. Adjust where the bend is in the wires if one side is higher than the other.
***Install the secondary runners perpendicular to your mains by clipping them in place. Locate the slots on the main runners every 2 ft (0.61 m). Lift your 4 ft (1.2 m) runners above the main runners and feed them into the slots on the mains. Put a secondary runner every 2 ft (0.61 m) along your main runners.[10]
Tip: If you want a 2 ft × 2 ft (0.61 m × 0.61 m) tile system, click 2 ft (0.61 m) secondary runners in the center each 4 ft (1.2 m) runner.
Part 3 Installing the ceiling tiles
***Make holes in the tiles for any lighting or ductwork first. Locate any areas on your ceiling where you need to make an opening for your ducts or light fixtures. Trace the end of the duct or the size of the light feature onto the back of one of your tiles. Cut the shape out of the tile with a sharp utility knife.[11]
****If you're installing a full-panel fluorescent light fixture, you don't need to cut any shapes from the tiles.
***Trim any edge tiles down to size with a utility knife. Your room will most likely have edges that won't fit full-sized tiles. Measure the grid opening for the tile and add 3⁄8 in (0.95 cm) to the measurement you found. Transfer that measurement to tile and cut the piece to size using a utility knife.[12]
****Avoid using any power equipment to cut your tiles since it will generate a lot of dust.
Tip: Tiles usually come in 2 ft × 4 ft (0.61 m × 1.22 m) or 2 ft × 2 ft (0.61 m × 0.61 m) sizes. While 2 ft × 4 ft (0.61 m × 1.22 m) tiles use less material and are more cost effective, they do not have the same versatility as 2 ft × 2 ft (0.61 m × 0.61 m) tiles.
***Cut out a 3⁄8 in (0.95 cm) flange in any cut edge of your tiles. The flanges rest on your runners and make the tile have more dimension when you put it in your ceiling. Measure in 3⁄8 in (0.95 cm) from any edge that doesn't have a flange and draw a line with a pencil. Follow along the line with a utility knife, only cutting halfway through the tile. Make another cut on the side of the tile at the same depth as your first cut to remove the flange piece.
****This only needs to be done if your tiles don't have flanges already.
***Lift the tiles through the grid and set them on top of the grid. Start in the center of your room and work towards the edges. Angle the tiles and lift them through the grid system. Straighten the tiles out before setting the flanges on the runners. Continue putting the tiles into your ceiling until it's completely covered.[14]
****Make sure the tiles are level as you install them. If you find any that aren't level, adjust the runners before moving on.Accessories Suspension Ceiling
A-Shaped Carrier Material:Steel Surface treatment: Zincification Height:40mm Length:3000mm Standard thickness:0.8mm | A-Shaped skeleton fitting Material: Steel Surface treatment:Zincification Height:43mm Length:70mm Standard thickness:1.0mm | A-Shaped skeleton fitting Material:Steel Surface treatment: Zincification Height:83/95mm Standard thickness:1.0mm |
Triangular skeleton Material:Steel Surface treatment: Zincification Height:25mm Length:3000mm Standard thickness:0.8mm | Main skeleton fitting Material:Steel Surface treatment: Zincification Length:3000mm Standard thickness:1.0mm | Triquetrous skeleton fitting Materials:Steel Surface treatment: Zincification Height:90mm Standard thickness:1.0mm |
Main skeleton Material: Steel Height:38/50mm Length:3000mm standard thickness:0.8mm | The main skeleton Hanger Material: Steel Surface treatment:Zincification Height:95/105mm Standard thickness:1.0mm | Main skeleton fitting Material:Steel Surface Treatment:Zincification Height:41/53mm Standard thickness:1.0mm |
M8 Hanger Material:Steel Surface treatment:Zincification | L-Shaped trimming angle Material: Grade AA Aluminum alloy Surface treatment: Electrostatic powder coating Specification:25*25mm Length:3000mm Standard thickness:0.8mm | W-Shaped trimming angle Material: Grade AA Aluminum alloy Surface treatment: Electrostatic powder coating Specifications:25mm*25mm*25mm Length:3000mm Standard thickness:0.8mm |
Production Process
1.Roller Coating Production line1-roller coating production line2-powder coating workshop
punching&slicing cutting line1-punching&slicing cutting line 2- slicing cutting production-automatical machine of fabric sticking- screen printing production line- molding production lineTerms1.Payment: 30%TT in advance, balance when copy of B/L
2.The delivery port:Shenzhen port, Guangzhou Port or other China Port
3.The delivery time: Within 15-20 working days after receiving the deposit payment
4.In the transport and storage process should pay attention to moisture and compressive deformation
Production Line for Aluminum Suspended Ceiling
1.Roller Coating Production line1-roller coating production line2-powder coating workshop
punching&slicing cutting line1-punching&slicing cutting line 2- slicing cutting production-automatical machine of fabric sticking- screen printing production line- molding production linePackage for ceiling suspension
Packed in cartons with plastic bags protection
600X600 Carton size: 610X335X610mm, 30pieces per carton
300X300 Carton size: 650X350X360mm, 64pieces per carton
600X1200 Carton size: 1210X610X215mm, 20pieces per carton.
Delivery Time : 7-30 days after receiving the deposit.Why Choose US Aluminum Ceiling Tile
Q: What is the minumum order quantity?
A:800Square meters for aluminum composite panel, 1 ton for color coated aluminum coil, 1200 tube for silicone sealant.
Q: What is the delivery time?
A: 15~20 Working days after deposit. Except for public holidays.
Q: How can you guarantee the quality?
A: We have rigorous quality test system, from raw materials to finished products, the materials must be checked and signed by QC People.
Q: How long can I get a quote?
A: The quotation can be provided not longer than 24 hours on condition that we know all details requirements.
Q: Can I get a sample?
A: Yes we offer free samples. Delivery cost is to be paid by clients.
Q: Can you provide OEM Service?
A: Yes, we can produce under you own brandname. Logo and design need to be provided so as to make customized brandname.
Q: Can I buy installation accessories from you?
A: Yes, we provide wet wall and dry wall system installation accessories. If you want to know more about the installation of aluminum ceiling, please click the website:gxsaiyi.en.made-in-china.com
Q: Why can I trust you and place order with you?
A: From 2008 TO 2018 SAIYI is with 10 years experience in this industry, we have served clients from more than 100countries, Saiyi is well-known for its quality and Saiyi team win clients'trust by honesty and down to earth business style.
Address:
Rm 3202, Bldg 2, Guangyuan Int′l Dist., No. 86, Zhuxi Rd., Nanning, Guangxi
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Construction & Decoration
Management System Certification:
ISO 9001, ISO 14001
Company Introduction:
Established in 2008, Guangxi Nanning Saiyi Building Materials Co., Ltd., is a professional manufacturer and exporter that is concerned with the design, development and the production of aluminum ceilings, covering clip in ceilings, lay in ceilings, baffle ceilings, grid ceilings, strip ceilings, curtain wall, etc...We are located in Nanning, China, with convenient transportation access. All of our products comply with international quality standards and are greatly appreciated in variety of different markets throughout the world.
Covering an area of 20, 046.5 square meters, we now have over 50 employees, boast and annual sales figure the exceeds USD three million and currently export 36 % of our production worldwide.
Our well-equipped facilities and excellent quality control throughout all stages of production enable us to guarantee total customer satisfaction. Besides, we have received ISO9001: 2008 Certificate, SGS, ISO10041, TUV, MA.
As a result of our high quality products and outstanding customer service, we have gained a global sales network reaching the market of North America, Europe, Middle East, Southeast Asia, Africa, etc...
If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.